Skip to content
Enerson Geophysical
TR

Borehole geophysics and televiewer logging

Wireline logging from optical and acoustic televiewers to full-waveform sonic, density-neutron and gyro deviation.

Geophysical borehole logging measures rock and fluid properties continuously along the hole. Separate logging passes record natural radioactivity, resistivity, borehole diameter, acoustic travel time and 360° images of the borehole wall.

Optical (OTV) and acoustic (ATV) televiewer images are oriented and unwrapped so that planar features appear as sinusoids. Picking them gives the dip and dip direction of fractures, veins and bedding. Gyro surveys measure inclination and azimuth inside steel casing or in magnetic ground and reconstruct the true 3D path of the hole, so that every core interval and log value is placed where it actually is.

Our R&D work includes in-house development of borehole inclination and azimuth instruments.

Applications

  • Orientation of fractures, veins and bedding
  • Rock mass and geotechnical characterisation
  • Lithology and correlation between holes
  • Hole deviation and target intersection
  • Cement bond and well integrity
  • Water inflow zones

Equipment we use

  • Optical televiewer (OBI)
  • Acoustic televiewer (ABI)
  • Full-waveform sonic (FWS)
  • Cement bond log (CBL)
  • Resistivity, SP and natural gamma
  • Magnetic susceptibility
  • Density and neutron
  • Flowmeter
  • Three-arm caliper
  • Fluid temperature and conductivity
  • Gyro deviation probe
Equipment

Figures are conceptual illustrations, not survey data.

Field Applications

  • Borehole logging at a drill rig
  • Enerson wireline logging vehicle and drill rig
  • Cable winch in the logging vehicle
  • Recording and data control in the logging vehicle
  • Logging probe being lowered into a borehole
  • Night-shift borehole logging
  • Optical televiewer image and structural analysis
  • Composite borehole log

Request for Proposal

Upon receipt of information on the project objective, survey area and schedule, we will submit a proposal setting out the appropriate method, work programme and deliverables.